The advantages

• no mechanical contact between ship and
   construction

• maximisation of safety (danger of crushing)

• maximisation of access

• 500 kg weight capacity with wave height of 3 m
   – “weather window” 88 %

• 2000 kg weight capacity with wave height of 1.5 m
   – “weather window” 55 %

• maximisation of operating position

• safeguarding own know-how by avoidance of
   seasonal work

• safeguarding jobs